{"id":60,"date":"2025-02-04T21:52:47","date_gmt":"2025-02-04T19:52:47","guid":{"rendered":"https:\/\/npce.if.ua\/?page_id=60"},"modified":"2026-04-08T01:21:01","modified_gmt":"2026-04-07T22:21:01","slug":"vyrobnychi","status":"publish","type":"page","link":"https:\/\/npce.if.ua\/en\/poslugy\/vyrobnychi\/","title":{"rendered":"Electrical Installation"},"content":{"rendered":"<table class=\"table table-striped table-bordered\">\n<thead class=\"table-dark\">\n<tr>\n<th>No.<\/th>\n<th>Type of Work<\/th>\n<th>Unit (Additional Conditions)<\/th>\n<th>Price (UAH)<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>1<\/td>\n<td>Diagnostics of residential electrical panel<\/td>\n<td>pcs<\/td>\n<td>300.00<\/td>\n<\/tr>\n<tr>\n<td>2<\/td>\n<td>Installation of socket box in prepared opening<\/td>\n<td>pcs<\/td>\n<td>60.00<\/td>\n<\/tr>\n<tr>\n<td>3<\/td>\n<td>Installation of electrical equipment on DIN rail<\/td>\n<td>pcs<\/td>\n<td>50.00<\/td>\n<\/tr>\n<tr>\n<td>4<\/td>\n<td>Connection of electrical equipment in panel<\/td>\n<td>pcs<\/td>\n<td>1400.00<\/td>\n<\/tr>\n<tr>\n<td>5<\/td>\n<td>Wiring of junction boxes<\/td>\n<td>pcs<\/td>\n<td>110.00<\/td>\n<\/tr>\n<tr>\n<td>6<\/td>\n<td>Installation of panel accessories<\/td>\n<td>pcs<\/td>\n<td>260.00<\/td>\n<\/tr>\n<tr>\n<td>7<\/td>\n<td>Installation of circuit breakers<\/td>\n<td>pcs<\/td>\n<td>110.00<\/td>\n<\/tr>\n<tr>\n<td>8<\/td>\n<td>Diagnostics of sockets and switches<\/td>\n<td>pcs<\/td>\n<td>70.00<\/td>\n<\/tr>\n<tr>\n<td>9<\/td>\n<td>Diagnostics of floodlights<\/td>\n<td>pcs<\/td>\n<td>260.00<\/td>\n<\/tr>\n<tr>\n<td>10<\/td>\n<td>Removal of circuit breakers<\/td>\n<td>pcs<\/td>\n<td>115.00<\/td>\n<\/tr>\n<tr>\n<td>11<\/td>\n<td>Dismantling of distribution panels<\/td>\n<td>pcs<\/td>\n<td>210.00<\/td>\n<\/tr>\n<tr>\n<td>12<\/td>\n<td>Dismantling of junction boxes<\/td>\n<td>pcs<\/td>\n<td>60.00<\/td>\n<\/tr>\n<tr>\n<td>13<\/td>\n<td>Installation of 24-module distribution board<\/td>\n<td>pcs<\/td>\n<td>610.00<\/td>\n<\/tr>\n<tr>\n<td>14<\/td>\n<td>Installation of 12-module distribution board<\/td>\n<td>pcs<\/td>\n<td>410.00<\/td>\n<\/tr>\n<tr>\n<td>15<\/td>\n<td>Installation of 3-pole circuit breakers<\/td>\n<td>pcs<\/td>\n<td>340.00<\/td>\n<\/tr>\n<tr>\n<td>16<\/td>\n<td>Installation of 2-pole circuit breakers<\/td>\n<td>pcs<\/td>\n<td>230.00<\/td>\n<\/tr>\n<tr>\n<td>17<\/td>\n<td>Cable continuity testing<\/td>\n<td>pcs<\/td>\n<td>90.00<\/td>\n<\/tr>\n<tr>\n<td>18<\/td>\n<td>Installation of control buttons<\/td>\n<td>pcs<\/td>\n<td>460.00<\/td>\n<\/tr>\n<tr>\n<td>19<\/td>\n<td>Installation of plastic cable trunking<\/td>\n<td>m<\/td>\n<td>60.00<\/td>\n<\/tr>\n<tr>\n<td>20<\/td>\n<td>Installation of metal cable trays<\/td>\n<td>m<\/td>\n<td>260.00<\/td>\n<\/tr>\n<tr>\n<td>21<\/td>\n<td>Installation of lighting fixtures<\/td>\n<td>pcs<\/td>\n<td>310.00<\/td>\n<\/tr>\n<tr>\n<td>22<\/td>\n<td>Installation of surface-mounted sockets<\/td>\n<td>pcs<\/td>\n<td>110.00<\/td>\n<\/tr>\n<tr>\n<td>23<\/td>\n<td>Installation and wiring of junction boxes<\/td>\n<td>pcs<\/td>\n<td>310.00<\/td>\n<\/tr>\n<tr>\n<td>24<\/td>\n<td>Installation of bolts and equipment connection<\/td>\n<td>pcs<\/td>\n<td>80.00<\/td>\n<\/tr>\n<tr>\n<td>25<\/td>\n<td>Diagnostics of three-phase electric motors<\/td>\n<td>pcs<\/td>\n<td>410.00<\/td>\n<\/tr>\n<tr>\n<td>26<\/td>\n<td>Diagnostics of single-phase electric motors<\/td>\n<td>pcs<\/td>\n<td>210.00<\/td>\n<\/tr>\n<tr>\n<td>27<\/td>\n<td>Diagnostics of single-phase voltage relay<\/td>\n<td>pcs<\/td>\n<td>110.00<\/td>\n<\/tr>\n<tr>\n<td>28<\/td>\n<td>Configuration of single-phase voltage relay<\/td>\n<td>pcs<\/td>\n<td>200.00<\/td>\n<\/tr>\n<tr>\n<td>29<\/td>\n<td>Diagnostics of three-phase voltage relay<\/td>\n<td>pcs<\/td>\n<td>200.00<\/td>\n<\/tr>\n<tr>\n<td>30<\/td>\n<td>Configuration of three-phase voltage relay<\/td>\n<td>pcs<\/td>\n<td>400.00<\/td>\n<\/tr>\n<tr>\n<td>31<\/td>\n<td>Energy monitoring of electrical panel<\/td>\n<td>pcs<\/td>\n<td>600.00<\/td>\n<\/tr>\n<tr>\n<td>32<\/td>\n<td>Diagnostics of batteries up to 60 Ah<\/td>\n<td>pcs<\/td>\n<td>500.00<\/td>\n<\/tr>\n<tr>\n<td>33<\/td>\n<td>Diagnostics of batteries over 60 Ah<\/td>\n<td>pcs<\/td>\n<td>800.00<\/td>\n<\/tr>\n<tr>\n<td>34<\/td>\n<td>Repair of control stations<\/td>\n<td>pcs<\/td>\n<td>100.00<\/td>\n<\/tr>\n<tr>\n<td>35<\/td>\n<td>Cable cutting and stripping<\/td>\n<td>m<\/td>\n<td>21.00<\/td>\n<\/tr>\n<tr>\n<td>36<\/td>\n<td>Insulation resistance measurement<\/td>\n<td>pcs<\/td>\n<td>400.00<\/td>\n<\/tr>\n<tr>\n<td>37<\/td>\n<td>PID controller configuration<\/td>\n<td>pcs<\/td>\n<td>320.00<\/td>\n<\/tr>\n<tr>\n<td>38<\/td>\n<td>Frequency converter configuration<\/td>\n<td>pcs<\/td>\n<td>400.00<\/td>\n<\/tr>\n<tr>\n<td>39<\/td>\n<td>UPS system diagnostics<\/td>\n<td>pcs<\/td>\n<td>300.00<\/td>\n<\/tr>\n<tr>\n<td>40<\/td>\n<td>MPPT controller diagnostics<\/td>\n<td>pcs<\/td>\n<td>200.00<\/td>\n<\/tr>\n<tr>\n<td>41<\/td>\n<td>Diagnostics of solar panels up to 24V<\/td>\n<td>pcs<\/td>\n<td>100.00<\/td>\n<\/tr>\n<tr>\n<td>42<\/td>\n<td>Soldering of solar elements<\/td>\n<td>pcs<\/td>\n<td>30.00<\/td>\n<\/tr>\n<tr>\n<td>43<\/td>\n<td>Wire soldering (per connection)<\/td>\n<td>pcs<\/td>\n<td>20.00<\/td>\n<\/tr>\n<tr>\n<td>44<\/td>\n<td>Diagnostics of 12V\u2013220V inverters<\/td>\n<td>pcs<\/td>\n<td>200.00<\/td>\n<\/tr>\n<tr>\n<td>45<\/td>\n<td>Diagnostics of electricity meters<\/td>\n<td>pcs<\/td>\n<td>200.00<\/td>\n<\/tr>\n<tr>\n<td>46<\/td>\n<td>Installation of electricity meters<\/td>\n<td>pcs<\/td>\n<td>100.00<\/td>\n<\/tr>\n<tr>\n<td>47<\/td>\n<td>Diagnostics of electromagnetic contactors<\/td>\n<td>pcs<\/td>\n<td>100.00<\/td>\n<\/tr>\n<tr>\n<td>48<\/td>\n<td>Installation of mounting components in panel<\/td>\n<td>pcs<\/td>\n<td>20.00<\/td>\n<\/tr>\n<tr>\n<td>49<\/td>\n<td>Diagnostics of signal lamps<\/td>\n<td>pcs<\/td>\n<td>200.00<\/td>\n<\/tr>\n<tr>\n<td>50<\/td>\n<td>Crimping of cable sleeves (excluding sleeves)<\/td>\n<td>pcs<\/td>\n<td>25.00<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><a href=\"https:\/\/npce.if.ua\/wp-content\/uploads\/2025\/04\/perelikplat.pdf\" class=\"btn btn-primary\" download><br \/>\nDownload list of services (PDF)<br \/>\n<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>No. Type of Work Unit (Additional Conditions) Price (UAH) 1 Diagnostics of residential electrical panel pcs 300.00 2 Installation of socket box in prepared opening pcs 60.00 3 Installation of electrical equipment on DIN rail pcs 50.00 4 Connection of electrical equipment in panel pcs 1400.00 5 Wiring of junction boxes pcs 110.00 6 Installation [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":44,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-60","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/npce.if.ua\/en\/wp-json\/wp\/v2\/pages\/60","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/npce.if.ua\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/npce.if.ua\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/npce.if.ua\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/npce.if.ua\/en\/wp-json\/wp\/v2\/comments?post=60"}],"version-history":[{"count":7,"href":"https:\/\/npce.if.ua\/en\/wp-json\/wp\/v2\/pages\/60\/revisions"}],"predecessor-version":[{"id":292,"href":"https:\/\/npce.if.ua\/en\/wp-json\/wp\/v2\/pages\/60\/revisions\/292"}],"up":[{"embeddable":true,"href":"https:\/\/npce.if.ua\/en\/wp-json\/wp\/v2\/pages\/44"}],"wp:attachment":[{"href":"https:\/\/npce.if.ua\/en\/wp-json\/wp\/v2\/media?parent=60"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}